Chapel floor is poured

As the sun rose this morning, concrete trucks arrived to pour the floor of the Bishop Selwyn Chapel.  The red wire you see can see in the first photo is the in-floor heating.

2015-02-17 Floor pour

2015-02-17 Floor pour (2)

2015-02-17 Floor pour (3)

Advertisements