Great excitement today as the roof was lifted onto the Bishop Selwyn Chapel. The lengths of steel for the roof were brought to site a number of weeks ago and the roof assembled was on the ground. This morning a 200 tonne capacity crane set up on site and lifted the roof onto the columns.

Roof assembled on the ground
Roof assembled on the ground
Roof being lifted through the air
Roof being lifted through the air
View towards St Mary's - the roof makes contact with the columns
View towards St Mary’s – the roof makes contact with the columns