Lifting the panels

Yesterday afternoon two large cranes were trucked into site and set up ready for the arrival of the pre-cast concrete wall panels this morning. The smaller crane is needed to raise the panel on the truck into the right position for the larger crane to lift it into the air and position it in place.

Two cranes arrive at Holy Trinity Cathedral
Two cranes arrive at Holy Trinity Cathedral
The first panel arrives
The first panel arrives
Both cranes in action
Both cranes in action
The panel is lifted
The panel is lifted
and lowered into place
and lowered into place