High Altar Wall Progress

Construction of the High Altar wall adjoining the Bishop Selwyn Chapel to Holy Trinity Cathedral is well underway. At the end of last week a small hole was made in the scaffolding wrap to pass through the Gibraltar board in pieces sized for the structural framing. We hope to have the wall finished, scaffolding down and Cross restored within weeks. Thank you to ASPEC Construction for being so respectful of this sacred space while this work has been underway in the Sanctuary.

2015-05-07

Advertisements